The Association of Model Submariners.

Would you like to react to this message? Create an account in a few clicks or log in to continue.

* THE FORUM FOR ALL THOSE INTERESTED IN BUILDING AND OPERATING MODEL SUBMARINES *



Join the AMS - Registered Forum users can become members of the AMS and it's free ...... To join send an email with your name , address and phone number to amstreasure@googlemail.com


For further details of any events shown here also see the "Shows and Events" section on the forum

*HOPING FOR A BETTER 2021 AND MORE OF THESE EXCELLENT FREE EVENTS ALL AROUND THE COUNTRY!

.

CANCELLED because of coronavirus. Papplewick Pumping Station, Nottingham, Sunday 12th & Monday 13th April
CANCELLED because of coronavirus. Bournville Sub Day, Sunday 10th May 2020

. ,

(CANCELLED) Submarine, Boating & Sailing Weekend, Norwich MBC, Weekend of 25,26th July

,./
.
Model Boat Convention, Haydock Park (Cancelled this year)

.

CANCELLED. Bournville Sub Day, Sunday 13th September

,,,,

(CANCELLED) Club Submarine Regatta, Furness MBC, Barrow in Furness, Sunday 20th Sept 2020

Who is online?

In total there is 1 user online :: 0 Registered, 0 Hidden and 1 Guest :: 1 Bot

None


Most users ever online was 180 on Tue Nov 05, 2019 6:03 am

Latest topics

» openLRS on 458Mhz and 433Mhz and submarines
US CONFORM concept sub EmptyTue Mar 02, 2021 1:14 pm by david f

» A Few Renders
US CONFORM concept sub EmptyTue Mar 02, 2021 12:49 pm by david f

» Has Anyone Made a USN DSRV or Japanese One
US CONFORM concept sub EmptySun Feb 28, 2021 7:16 pm by ccclarke

» What PROGRAM (S) do YOU use/How You use it/What can be don with him
US CONFORM concept sub EmptySat Feb 27, 2021 2:18 am by ccclarke

» LEVEL CONTROLLER DIY
US CONFORM concept sub EmptyTue Feb 23, 2021 12:39 pm by david f

» Outstanding. Well built 1/350 scale submarine.
US CONFORM concept sub EmptyThu Feb 18, 2021 7:03 pm by gp100man

» HMS Resolution bellows type ballast system
US CONFORM concept sub EmptyMon Feb 15, 2021 3:21 pm by david f

» U Class British - ORP Dzik ( built in Barrow)
US CONFORM concept sub EmptySun Feb 14, 2021 12:50 pm by Marek Smolski

» 1/150 Academy Type IX B RC Conversion
US CONFORM concept sub EmptyTue Feb 09, 2021 4:54 am by redboat219

Statistics

Our users have posted a total of 11286 messages in 1850 subjects

We have 887 registered users

The newest registered user is Schrettner

    US CONFORM concept sub

    avatar
    Tom(ADMIN)
    AMS Forum Owner

    Posts : 3003
    Join date : 2010-11-05
    Age : 61
    Location : Nevada, USA

    US CONFORM concept sub Empty US CONFORM concept sub

    Post  Tom(ADMIN) Wed Nov 24, 2010 11:17 am

    An image of a model from the US Navy concept formulation (CONFORM) submarine project from the late 1960s. CONFORM was a possible follow-on to the Permit (SSN 594) and Sturgeon (SSN 637) classes devised by Naval Sea Systems Command (NavSea) circa 1967-68. By November 1968, the initial CONFORM studies had produced 36 design concepts, examining such alternative features as twin reactors, single turbines, contra-rotating propellers, deep-depth capability, and larger diameter torpedo tubes.

    One CONFORM concept was to use a derivative of the S5G Natural Circulation Reactor (NCR) plant that Vice Admiral Hyman G Rickover was developing for the one-of-a-kind Narwhal (SSN 671). The NCR uses the natural convection of the heat exchange fluids (coolants) at lower speeds rather than circulating pumps, a major noise source of propulsion machinery in nuclear submarines.

    The S5G was estimated to be capable of providing a submerged speed of more than 30 knots with a CONFORM submarine hull approximately the same size as Sturgeon, about 4,800 tons submerged. 20,000 shaft horsepower would power a counter-rotating propeller.

    One of the most innovative features of the pictured CONFORM design was its periscopes and masts that folded down flush onto the hull rather than retracting vertically into the hull. This feature would have reduced pressure hull penetrations, provided more flexibility in internal arrangement, and possibly alleviated the need for a sail. A small bridge structure could be raised and then folded down flush onto the hull.

    The front end of the CONFORM was to be greatly improved, with an increased number of weapons, advanced sonar, and a high degree of automation.

    According to Polmar, the CONFORM project was scuttled by Vice Admiral Hyman G Rickover in favor of the Los Angeles class.

    Source: Cold War Submarines: the Design and Construction of U.S. and Soviet Submarines
    by Norman Polmar and Kenneth J. Moore, Brassy's, Inc., 2004.

    This is the only image I was able to find of the boat, and all I had to go when I build my model of it.


    US CONFORM concept sub Confor10

      Current date/time is Thu Mar 04, 2021 11:50 am